Anode Beam Raiser

TOMAGO ALUMINIUM, TOMAGO Fixed contract to design, manufacture and install pneumatic impact system.

Duration: 18 months

Longwall Roof Support Cylinders

WYEE COLLIERY, FASSIFERN Fixed contract to assess, modify, recondition and test 50 off cylinders.

Duration: 3 months

Product Inspection and Bundling upgrade

ONESTEEL, MARKET MILLS Design review and project management of $3M product handling upgrade. Supervision and commissioning of power units, valve stations, pipe-work and actuators to plant specifications. Production of maintenance schedules and ongoing services.

Duration: 12 months

Power Unit and Installations

REDBANK POWER STATION, SINGLETON Install / commission all hydraulic and pneumatic systems.

Duration: 3 months

Lubrication and hydraulic installations

PWCS � STAGE 3 UPGRADE Install / commission lubrication and hydraulic systems.

Duration: 5 months

Overburden Drill Rig Cylinder design & Manufacture

METSO MINERALS, RUTHERFORD Australian built mobile Drill Rig complete cylinder design, manufacture and installation. Six machines ( 132 cylinders ) completed, commissioned and operational in Western Australia and the Hunter Valley.

Duration: 24 months

Reconditioning Yard Upgrade

ONESTEEL, MARKET MILLS Fixed contract to design, manufacture and install cylinders, valves and pipework for new production capacity.

Duration: 2 months

Lubrication and hydraulic installations

BARCLAY MOWLEM � DURALIE HWE COAL MINE Install / commission lubrication and hydraulic systems to client specifications. Production of maintenance schedules and ongoing services for train loader and materials handling plant.

Duration: 4 months

Hydraulic systems upgrade

CAMBERWELL COAL � SINGLETON Review and upgrade of train loader system to provide fail safe operation. Upgrade of coal valve hydraulic control methods and maintenance schedule production.

Duration: 6 months

Hydraulic systems maintenance contract

ROADS & TRAFFIC AUTHORITY � SWANSEA BRIDGE Three year contract to service, maintain, and upgrade hydraulic system controlling bridge span opening.

Duration: 36 months

Hydraulic system design, build and manufacture

DUST MANAGEMENT INTERNATIONAL � CENTRAL COAST Dust fan extraction system design and build of proto-type in conjunction with client. Turn key installation included fabrication, electrics and commissioning manual.

Duration: 3 months

Hydraulic system design, build and manufacture

MCM MANUFACTURING � NEWCASTLE Mobile diesel driven hydraulic shredding machine. System design and build of proto-type in conjunction with client. Turn key installation included fabrication, electrics, commissioning training and service/maintenance manual.

Duration: 6 months

Hydraulic system installation, project management and improvement projects

HYDRO ALUMINIUM SMELTER � HUNTER VALLEY Major client upgrade of Carbon Plant & Potlines. Fluidtech International supply of labour, engineering, plus supply and install of pipework and associated components. Turn key installation included mechanical & fabrication installs, commissioning and training.

Duration: 12 months