Anode Beam Raiser
TOMAGO ALUMINIUM, TOMAGO
Fixed contract to design, manufacture and install pneumatic impact system.
Duration: 18 months
Longwall Roof Support Cylinders
WYEE COLLIERY, FASSIFERN
Fixed contract to assess, modify, recondition and test 50 off cylinders.
Duration: 3 months
Product Inspection and Bundling upgrade
ONESTEEL, MARKET MILLS
Design review and project management of $3M product handling upgrade. Supervision and
commissioning of power units, valve stations, pipe-work and actuators to plant
specifications. Production of maintenance schedules and ongoing services.
Duration: 12 months
Power Unit and Installations
REDBANK POWER STATION, SINGLETON
Install / commission all hydraulic and pneumatic systems.
Duration: 3 months
Lubrication and hydraulic installations
PWCS � STAGE 3 UPGRADE
Install / commission lubrication and hydraulic systems.
Duration: 5 months
Overburden Drill Rig Cylinder design & Manufacture
METSO MINERALS, RUTHERFORD
Australian built mobile Drill Rig complete cylinder design, manufacture and installation.
Six machines ( 132 cylinders ) completed, commissioned and operational in Western
Australia and the Hunter Valley.
Duration: 24 months
Reconditioning Yard Upgrade
ONESTEEL, MARKET MILLS
Fixed contract to design, manufacture and install cylinders, valves and pipework for
new production capacity.
Duration: 2 months
Lubrication and hydraulic installations
BARCLAY MOWLEM � DURALIE HWE COAL MINE
Install / commission lubrication and hydraulic systems to client specifications.
Production of maintenance schedules and ongoing services for train loader and
materials handling plant.
Duration: 4 months
Hydraulic systems upgrade
CAMBERWELL COAL � SINGLETON
Review and upgrade of train loader system to provide fail safe operation. Upgrade of
coal valve hydraulic control methods and maintenance schedule production.
Duration: 6 months
Hydraulic systems maintenance contract
ROADS & TRAFFIC AUTHORITY � SWANSEA BRIDGE
Three year contract to service, maintain, and upgrade hydraulic system controlling
bridge span opening.
Duration: 36 months
Hydraulic system design, build and manufacture
DUST MANAGEMENT INTERNATIONAL � CENTRAL COAST
Dust fan extraction system design and build of proto-type in conjunction with client.
Turn key installation included fabrication, electrics and commissioning manual.
Duration: 3 months
Hydraulic system design, build and manufacture
MCM MANUFACTURING � NEWCASTLE
Mobile diesel driven hydraulic shredding machine. System design and build of proto-type in
conjunction with client. Turn key installation included fabrication, electrics,
commissioning training and service/maintenance manual.
Duration: 6 months
Hydraulic system installation, project management and improvement projects
HYDRO ALUMINIUM SMELTER � HUNTER VALLEY
Major client upgrade of Carbon Plant & Potlines. Fluidtech International supply of labour,
engineering, plus supply and install of pipework and associated components. Turn key
installation included mechanical & fabrication installs, commissioning and training.
Duration: 12 months