FORMWORK PTE, SINGAPORE
Malaysia's Twin Towers
Design and manufacture of 180 cylinders and 4 hydraulic power units to assist
in the erection of concrete slip form work on Malaysia�s tallest twin story buildings.
When complete, both buildings will exceed current 90 storey building records.
Duration: 2 months
KUMAGAI GUMI, HONG KONG
West Harbour Tunnel
Design and manufacture of 24 x 1000 tonne module jacking assemblies, each cylinder
weighing 1.3 tonne, for the support and lowering of the concrete sub-structures.
Duration: 4 months
KUMAGAI GUMI, HONG KONG
,Central Harbour Tunnel
Design and manufacture of 32 x 1000 tonne module jacking assemblies, each
cylinder weighing 1.3 tonne, for the support and lowering of concrete sub-structures.
Duration: 6 months
CHINA NATIONAL RAILWAYS, CHINA
Test Rigs
Design, manufacture, installation and commissioning of two multi-purpose test stands. Training of personnel.
This order was won against nine other international companies.
Duration: 5 months
HATCH ASSOCIATES, HONG KONG
Power Station Coal Reclaimer
Design review, audit and system diagnostics carried out to enable detailed machine upgrade.
Consulting and specification preparation.
Duration: 3 months